While walking a second-floor hallway during the framing stage, Anthony noticed the ceiling felt “compressed.” Though the plans were correct, the physical space wasn’t. By rethinking a structural beam placement on-site, we restored the visual flow and saved the client from a massive aesthetic mistake.